Seattle & King County basement remodeling
Answer 5 quick questions and see a realistic price range for your basement. No obligation, and no one-page bid that grows 30% halfway through.
Start with question 1 →
Free basement estimate · about 60 seconds
Pick everything that applies.
Be honest. We test for moisture before we quote, because finishing over a damp wall is how basements fail.
Your preliminary range
Got it. We’ll call or text you within one business day to set up a walkthrough, and your written scope comes after we’ve seen the space.
Prefer to talk it through? Call 206-851-4233
By submitting, you agree BB-Builders Pro may call or text you about your project. Message and data rates may apply. Reply STOP to opt out. We never sell your information.
Real BB-Builders Pro basements
These are our own projects, not stock photos. The “before” shots show the stage most bids gloss over: framing, insulation, drywall and getting egress right.

BeforeAfter
BeforeAfter
BeforeAfterWatch the project
This is the same Seattle basement as the photos above: the bedroom, the bathroom and the kitchenette. In 84 seconds you’ll see it go from digging out the space to the final walkthrough.
The space went from open framing and a bare slab to a finished rec room. It has a wet bar, a stacked-stone feature wall, two new doors to storage and a bath, and a wood-look floor that handles below-grade moisture. Seattle.
Hear it from homeowners
Real BB-Builders Pro clients, on camera. Some of these projects were bathrooms or whole homes, not basements. The crew, the written scope and the weekly updates are the same on every job.
“I would recommend you guys to everybody.”
Karen, bathroom remodel client
From a gutted room to a finished bathroom, in Karen’s words.
What the whole process was really like, from the first walkthrough to the finished home.
Homeowners on what stood out most, from the first conversation to the final walkthrough.
Swipe for more videos ›
Why our bid looks different
Most basement bids in Seattle fit on one page. Here’s what that page leaves out, and what ours shows instead.
| # | Line item | Status |
|---|---|---|
| 01 | Moisture test of slab and walls, plus drainage review before design | Included |
| 02 | Permit drawings, SDCI / city permit fees and inspections | Included |
| 03 | Egress window: cut foundation, window well, ladder and drainage | Per bedroom |
| 04 | Rigid foam on concrete walls, framing and insulation to code | Included |
| 05 | Electrical: new circuits, recessed lights, smoke & CO alarms | Included |
| 06 | Heat: ductless heat pump or extended duct run | Itemized |
| 07 | Bathroom: rough plumbing, shower, vanity, toilet, exhaust fan | Fixture allowance |
| 08 | Flooring rated for below-grade (LVP or carpet over pad) | Allowance per sq ft |
| 09 | Doors, trim, paint, final clean and walkthrough | Included |
Your real proposal puts a fixed dollar amount on every line. If something changes, you sign a written change order before any work happens.
Before you call it a bedroom
A bedroom that doesn’t meet code won’t count when you sell or rent, and it’s a real safety risk. Here’s what the inspector looks for in Seattle, from SDCI’s checklist for the 2021 Seattle Residential Code.
Every new bedroom and every newly finished basement needs an escape window. The opening has to be at least 20″ wide and 24″ high, with the sill no more than 44″ off the floor. It needs at least 5.0 sq ft of clear opening for a window at or below grade, which covers most basements, and 5.7 sq ft above that.
When the sill sits below the ground outside, you need a window well at least 3 ft by 3 ft. If the well is deeper than 44″, it needs a permanent ladder or steps.
New living space in an existing basement needs a 6’8″ ceiling, and bathrooms, laundry and storage need 6’4″. Some homes built before late 1979 can qualify lower. We measure before we design, so there are no surprises at inspection.
Smoke alarms go inside each bedroom, outside the sleeping area and on every floor, and they’re hardwired and linked together. Carbon-monoxide alarms go outside sleeping areas and on every floor.
A bedroom needs at least 70 sq ft and 7 ft in every direction. It also needs a permanent heat source. A plug-in space heater doesn’t count.
Unpermitted basements cause trouble at resale and with insurance. We pull the permit, schedule every inspection and hand you the final sign-off.
Basement suite or ADU
Seattle allows a basement apartment (an attached ADU) on most residential lots. A basement suite is often the most affordable way to add a second unit, because the foundation, walls and roof are already there.
How it works
We measure, test the walls and slab for moisture, check ceiling height and look at where egress can go.
You get every line priced, with allowances spelled out and nothing left vague. You’ll know exactly what’s included.
We produce the drawings and handle the city permit. You approve finishes before we order anything.
You keep the same project manager and the same crew, with a written update every week. Every change order is signed before the work.
The inspector signs off, then we walk the space with you and close the punch list. Every project comes with a 1-year warranty.
Real numbers
These are typical all-in ranges for permitted work. Your walkthrough pins down the number, and then it’s fixed.
Taking a dated basement back to the studs where needed: new layout, electrical, lighting, flooring and finishes.
Framing, insulation, electrical, heat, drywall and flooring, from bare concrete to finished living space.
On top of the finish: egress window for a legal bedroom, plumbing rough-in and a full bathroom.
Separate entrance, kitchenette, full bath and the fire and sound separation a legal unit needs.
From homeowners
Questions we get every week
It depends on size, what’s there now and whether you add a bathroom, bedroom or kitchenette. The quiz at the top gives you a preliminary range in about a minute. After a walkthrough, you get a line-item scope with a fixed price, so the number doesn’t move unless you change the plan in writing.
Permits come first, and design plus permits usually takes a few weeks. Construction for a typical finish runs about 10–16 weeks, depending on the scope. You get a written schedule before we start and a written update every week.
Yes, for almost any finish that adds walls, wiring, plumbing or a bedroom. Unpermitted basements cause trouble at sale and with insurance claims. We prepare the drawings, pull the permit and schedule every inspection.
Usually, yes, but the moisture gets fixed first. We test the slab and walls before we quote. If there’s a drainage or grading problem, the fix is its own line in your scope, so it isn’t a surprise after the drywall goes up.
If the room can get a code-compliant egress window and has enough ceiling height, yes. Cutting a new egress opening in a concrete foundation is common, and it’s a line item in our scope.
On most Seattle lots, yes. A basement unit needs a separate entrance, a kitchen, a bathroom, egress, and fire and sound separation from the main house. Pick “Rental unit or ADU” in the quiz and we’ll price it that way.
Almost always. We seal the work area with dust barriers, agree on work hours and an entry path, and clean up daily. You’ll know each week what’s happening next.
Yes. We offer financing with several plans to choose from. The most popular is 12 months with no payments. Plans are subject to credit approval, and we’ll walk you through the options at your walkthrough.
Seattle, the Eastside (Bellevue, Kirkland, Redmond, Sammamish, Issaquah), South King County (Renton, Kent, Auburn, Federal Way, Des Moines) and south Snohomish County.
No obligation. You’ll get a real number for your answers, then a walkthrough and a written scope if you want to go further.